YKF-DGN III 200CC CVT ATV | Balance Shaft 2WD Quad Bike

This cvt atv, the YKF-DGN III, is a 200cc adult ATV upgraded with a balance-shaft engine for smoother vibration characteristics at higher RPMs. Its 150/200cc air-cooled 4-stroke unit drives through CVT (F-N-R) and chain drive with front and rear disc brakes, 10-inch tires, and hydraulic suspension, reaching 70 km/h with 220 kg load capacity. At 168 kg in the 1850x1050x1050 mm body, this cvt atv is a refined DGN-series option for wholesale buyers.

Colors

Engine Type150/ 200CC, 4-Stroke, Air Cool, Balance Shaft, Single cylinder
TransmissionChain Drive
Max Speed (km/h)70 km/h
Dimensions And Weight1850x1050x1050mm 168kg
SKU: YKF-DGN-III Category:

$798.00

Secure B2B Order Process

Orders are confirmed by quotation and Proforma Invoice. T/T, L/C for qualified bulk orders, and Alibaba trade assurance are available upon request.

Pre-Shipment Quality Check

Each vehicle is inspected before shipment. Photos, videos, packing details, commercial invoice, and packing list can be provided.

Technical Specification
Engine Type
150/ 200CC, 4-Stroke, Air Cool, Balance Shaft, Single cylinder
Clutch
CVT, F-N-R
Driving Type
2WD
Transmission
Chain Drive
Fuel Type
Gasoline
Start Mode
Electric Start
Front Brake
Disc Brake
Rear Brake
Disc Brake
Front Suspension
Hydraulic with Damping
Front Tire
10inch
Rear Tire
10inch
Rim Type
Aluminum Rim
Climb Up
30-35°
Max Speed (km/h)
70 km/h
Max Loading (kg)
220kg
Battery
12V 9AH
Dimensions And Weight
1850x1050x1050mm 168kg
Package Size And Weight
1520x865x850mm 190kg
Quality Inspection
    Sourcing
  1. 01AP

    Accessories Purchase

    Vetted-supplier sourcing of frames, engines, drivetrain & electricals with full traceability.

  2. 02IQC

    Incoming Quality Control

    AQL sampling on every inbound lot; non-conforming parts rejected and returned.

  3. Production
  4. 03PA

    Product Assembly

    Torque-controlled assembly lines with station-level checklists for ATV, UTV, dirt & pit bikes.

  5. 04PQC

    Process Quality Control

    In-line inspection at critical stations; defects routed back to assembly for rework.

  6. 05FP

    Finished Product

    Engine run-in, brake, lighting, throttle and road-test verification on each unit.

  7. 06OQC

    Outgoing Quality Control

    Pre-shipment AQL audit per ANSI/ASQ Z1.4; any failure loops back to assembly.

  8. Dispatch
  9. 07FW

    Finished Goods Warehousing

    Climate-controlled storage, serialized bin locations and FIFO dispatch queue.

  10. 08PS

    Packing & Shipping

    Export-grade crating, fumigation, container loading plans and BL documentation.

Closed-loop rework

When PQC or OQC detects a non-conformity, the affected unit is routed back to Product Assembly with a traceable defect ticket. Nothing moves forward until it passes — zero-escape to our customers.