300CC Pr300 Trail Dirt Bike | Air-Cooled 4-Stroke Adult Enduro Motorcycle, YKF-H3 PR300
This 300cc pr300 trail dirt bike combines its engine and chassis equipment for trail and enduro riding. It uses a four-stroke, air-cooled PR300 (ZS175FMM-5A) MARK engine with 18kW of listed output. The powertrain also includes a PWK32 carburetor, electric and kick starting, and a 5-speed transmission. These features define how the bike starts, receives fuel, and transfers engine power. The adjustable suspension lets riders change the chassis settings, while hydraulic disc brakes and full-size 21/18-inch off-road wheels help complete the off-road setup.
| Engine Type | 2-Valve, 4-Stroke, Air Cool, Inclined Engine, Overhead Cam, PR300 (ZS175FMM-5A) MARK, Single cylinder |
|---|---|
| Displacement (cc) | 300CC |
| Max Power (kW/rpm) | 18kW/8500rpm |
| Max Torque (N.m/rpm) | 20/6000, 24N.m/6500rpm |
| Start Mode | Electric / Kick Start |
| Max Speed (km/h) | 130 km/h |
From
| Quantity | Price | Discount |
|---|---|---|
| 1-4 | $1,626.00 | $0.00 |
| 5-50 | $1,186.98 | 27% |
| 51+ | $1,089.42 | 33% |
Orders are confirmed by quotation and Proforma Invoice. T/T, L/C for qualified bulk orders, and Alibaba trade assurance are available upon request.
Each vehicle is inspected before shipment. Photos, videos, packing details, commercial invoice, and packing list can be provided.
Accessories Purchase
Vetted-supplier sourcing of frames, engines, drivetrain & electricals with full traceability.
Incoming Quality Control
AQL sampling on every inbound lot; non-conforming parts rejected and returned.
Product Assembly
Torque-controlled assembly lines with station-level checklists for ATV, UTV, dirt & pit bikes.
Process Quality Control
In-line inspection at critical stations; defects routed back to assembly for rework.
Finished Product
Engine run-in, brake, lighting, throttle and road-test verification on each unit.
Outgoing Quality Control
Pre-shipment AQL audit per ANSI/ASQ Z1.4; any failure loops back to assembly.
Finished Goods Warehousing
Climate-controlled storage, serialized bin locations and FIFO dispatch queue.
Packing & Shipping
Export-grade crating, fumigation, container loading plans and BL documentation.
Closed-loop rework
When PQC or OQC detects a non-conformity, the affected unit is routed back to Product Assembly with a traceable defect ticket. Nothing moves forward until it passes — zero-escape to our customers.
