YKF-UT03

Max Speed

Custom Colors

Motor15kW / 48V 205AH
Max Torque (N.m/rpm)110 N.m Peak Continuous Torque
Max Power (kW/rpm)30kW Peak / 15kW Continuous
Max Speed (km/h)120 km/h
Dimensions And Weight3140x1850x1580mm
SKU: YKF-UT03 Category:

$10,900.00

Optional Add-ons

Headliner

$15

Windshield

$45

Windshaft assembly

$120

Roof rack and LED spotlights

$120

Spare tire and spare tire rack

$135

EEC/EPA certification

$450

Quantity Price Discount
2-5 $10,700.00 $200.00
8+ $10,500.00 $400.00
Secure B2B Order Process

Orders are confirmed by quotation and Proforma Invoice. T/T, L/C for qualified bulk orders, and Alibaba trade assurance are available upon request.

Pre-Shipment Quality Check

Each vehicle is inspected before shipment. Photos, videos, packing details, commercial invoice, and packing list can be provided.

Technical Specification
Motor
15kW / 48V 205AH
Charging Time
6-8 Hours
Max Torque (N.m/rpm)
110 N.m Peak Continuous Torque
Max Power (kW/rpm)
30kW Peak / 15kW Continuous
Ignition Method
Electric Start
Maximum Climb Angle
≤70°
Max Speed (km/h)
120 km/h
Wheelbase (mm)
2290
Front Track (mm)
1545
Rear Track (mm)
1560
Ground Clearance (mm)
280
Net Weight (kg)
800
Max Loading (kg)
1000
Driving Type
4WD
Shock Absorber Type
Adjustable, Nitrogen Damping Shock Absorber
Front Suspension
Front Independent Suspension / Rear Blade Arm
Brake System
Dual-Piston Disc Brakes
Battery Capacity
48V 205AH
Tyre Size (Front/Rear)
25*8-14/25*10-14
Dimensions And Weight
3140x1850x1580mm
Package Size And Weight
2930x1770x850mm
Color
Black, Blue, Yellow, Green, Red
Quality Inspection
    Sourcing
  1. 01AP

    Accessories Purchase

    Vetted-supplier sourcing of frames, engines, drivetrain & electricals with full traceability.

  2. 02IQC

    Incoming Quality Control

    AQL sampling on every inbound lot; non-conforming parts rejected and returned.

  3. Production
  4. 03PA

    Product Assembly

    Torque-controlled assembly lines with station-level checklists for ATV, UTV, dirt & pit bikes.

  5. 04PQC

    Process Quality Control

    In-line inspection at critical stations; defects routed back to assembly for rework.

  6. 05FP

    Finished Product

    Engine run-in, brake, lighting, throttle and road-test verification on each unit.

  7. 06OQC

    Outgoing Quality Control

    Pre-shipment AQL audit per ANSI/ASQ Z1.4; any failure loops back to assembly.

  8. Dispatch
  9. 07FW

    Finished Goods Warehousing

    Climate-controlled storage, serialized bin locations and FIFO dispatch queue.

  10. 08PS

    Packing & Shipping

    Export-grade crating, fumigation, container loading plans and BL documentation.

Closed-loop rework

When PQC or OQC detects a non-conformity, the affected unit is routed back to Product Assembly with a traceable defect ticket. Nothing moves forward until it passes — zero-escape to our customers.